List Of Executed Project
No. | PROJECT | YEAR |
---|---|---|
1. | T.R.T PALAPA I & II GROUND STATION. | |
2. | DUMEZ TP-PT HUTAMA KARYA, RENTANG IRRIGATION PROJECT. | 1979 |
3. | ALSTOM GAS TURBINES TO VARIOUS LOCATIONS (12 UNITS) IN JAVA AND SUMATRA | 1976 – 1978 |
4. | DUMEZ TP-PT MERCU BUANA RAYA CONTRACTOR,SAGULING DAM. | 1980 – 1984 |
5. | DUMEZ TP– WISMA BUMIPUTERA OFFICE BUILDING IN JAKARTA. | 1980 – 1984 |
6. | ASLTOM GAS TURBINES (10 UNITS) TO VARIOUS LOCATIONS/POWER STATIONS IN JAVA, SUMATRA, BALI AND SULAWESI. | 1983 – 1984 |
7. | RELOCATION OF ALSTHOM GAS TURBINES FROM PULOGADUNG TO CIREBON (2 UNITS). | 1983 |
8. | VARIOUS PROJECTS : FACTORIES, SOEKARNO-HATTA AIRPORT INDOCEMENT KILNS LINE 7 & 8 (162 TONS EA). | 1983 – 1984 |
9. | ALSTOM/ STEIN POWER STATION OF BUKIT ASAM. | 1983 – 1988 |
10. | SPIE/ C.R.M.I MILL HOUSING HOT MILL KRAKATAU STEEL. | 1983 – 1988 |
11. | HOLEC DIESEL ENGINES WITH HEAVIEST UNITS OF 160 TONS IN JAVA WEST KALIMANTAN, NORTH SUMATRA. THE MOLUCCAS AND NORTH SULAWESI , IN COOPERATION PT. UNGGUL TURANGGA. | 1985 – 1986 |
12. | HAWKER SIDDELEY SCATTERED DIESEL PROJECT, 23 ENGINES EACH WEIGHING 85 TONS, TO 7 LOCATIONS IN WEST TIMOR, EAST KALIMANTAN, NORTH AND SOUTH SUMATRA, IN COOPERATION WITH PT UNGGUL TURANGGA. | 1985 – 1986 |
13. | SPIE/ CITRA, CLUB MEDITERRANNEE HOTEL IN NUSA DUA, BALI. | 1985 – 1988 |
14. | COGELEX CIRATA PROJECT, 7 POWER TRANSFORMERS WEIGHING 65 T EACH | 1987 – 1988 |
15. | CGEE ALSTOM TRANSFORMERS, 11 UNITS EACH 40/52 TONS, FROM JAKARTA TO SEMARANG BY BARGE, THEN TO 11 POWER STATIONS IN CETRAL JAVA INCLUDING POSITIONING ON THE FOUNDATIONS. | 1987 – 1988 |
16. | MERLIN GERIN AUXILIARY SUPPLIES FOR SURALAYA POWER STATION. | 1987 |
17. | PELITA AIR SERVICE – FOKKER – 1 PACKED (DAMAGED) AIR CRAFT FOKKER 28 FROM DUMAI AIRPORT TO SEAPORT, AND BARGING TO SINGAPORE FOR ITS TRANSHIPMENT TO HOLLAND. | 1987 |
18. | DUMEZ DUMPIL DAM. | 1988 |
19. | TOSHIBA/ KAMIGUMI TRANSPORTATION UNLOADING AND SHIFTING 8 UNITS TURBINES (LP & HP) AND GENERATORS WEIGHING UPTO 200 T UPTO THE POWER HOUSE LOCATED AT P.L.N GRESIK. | 1988 |
20. | ALSTHOM – ASSISTING SCALEX IN MOVING AND SHIFTING 9 UNITS OF 380 T DIESEL ENGINES AT INDOCEMENT CIBINONG. | 1988 |
21. | ELLEEN – DISCHARGING 1 UNIT TRANSFORMER OF 130 T EX. VESSEL FROM HAMBURG ONTO LCT IN SURABAYA ON THE 22nd SEPTEMBER 1988, UNLOADING AT SEMARANG PORT IN SPECIALLY PREPARED BEACHHEAD (24/09/1988) AND LAND TRANSPORT TI UNGARAN POWER STATION IN CENTRAL JAVA AND PLACEMENT ON FOUNDATION. | 1988 |
22. | SOFRESID – PERTAMINA – TOTAL FOR TAMBORA TUNU PROJECT OF 1.500 | |
23. | ALCATEL CABLE POWER XV CABLE DRUMS SUPPLY (STARTED IN MARCH 1989). | MARCH 1989 |
24. | .G.E.E. ALSTOM COMSIP JABOTABEK ELECTRIFICATION LINE OF JABOTABEK. | |
25. | COGELEX POWER XV THE PROJECT STARTED MIDDLE OF 1990. | 1990 |
26. | SOFRESID – PERTAMINA – TOTAL GAS LIFT PROJECT OF 2.500 T FINISHED IN 1991. | 1991 |
27. | DUMEZ TP – MAMAK DAM PROJECT, SUMBAWA BESAR THIS PROJECT FINISHED IN 1991. | 1991 |
28. | C.G.E.E ALSTOM COMSIP JABOTABEK ELECTRIFICATION LINE OF JABOTABEK | 1991 |
29. | COGELEX – JCC THIS PROJECT STARTED BY 1990 – 1991 | 1990 – 1991 |
30. | DUMEZ – BUKIT ASAM THIS PROJECT STARTED IN JUNE 1991, TOTAL 2.000 FT | JUNE 1991 |
31. | COGELEX – PAITON PLTU PAITON, STARTED IN APRIL 1992, TOTAL 4.00O TONS | APRIL 1992 |
32. | ALCATEL CABLE TELECOM III, TOTAL 120.000 FT (STARTED IN 1992) | 1992 |
33. | C.M.I PROJECT 104 X 100 T HEAVY LIFT THE PROJECT STARTED IN 1992 AND TOTAL 80.000 FT | 1992 |
34. | CEGELEC – GRESIK CEGELEC GRESIK SUBSTATION , TOTAL 5.000 T | 1992 |
35. | ALCATEL A.T.F.H TRANS SUMATRA, TOTAL 1.000 T | 1992 |
36. | DUMEZ – SINGKARAK DAM PROJECT AND IN TOTALISES 15.000 FT | MAY 1992 |
37. | GEC ALSTOM STEIN BUKIT ASAM 2 X 65 MGW PHASES 3 AND 4 4X 100 T, HEAVY LIFT, TOTAL 34.000 FT | SEPT 1992 |
38. | RHONE POULENC – INDOLEX | 1994 – 1995 |
39. | SOFRESID HANDIL TUNU II | 1995 |
40. | COGELEX SURALAYA SS | 1994 – 1995 |
41. | COGELEX PROTOCOL ’91 | 1994 – 1995 |
42. | GEC ALSTOM OMBILIN STEAM POWER PLANT 2 X 100 MGW, 4 X 100 T HEAVY LIFT | 1994 – 1996 |
43. | CMI GRATI STEAM BOILER (34 X 100t) HEAVY LIFT | 1994 – 1995 |
44. | ALCATEL CABLE NORTHERN ROAD | 1995 |
45. | ALCATEL CIT | 1995 |
46. | SNEF SHERATON BALI HOTEL | 1995 |
47. | PKB ALCATEL CABLE | 1996 – 1997 |
48. | U.K MIXED CREDIT 13 TRAFOS OF 68T | 1996 – 1997 |
49. | KOMARITIM/ ARCO 3 MODULES 72 T | 1996 |
50. | COGELEX – CILEGON SS 148 T X 4 UNIT TRANSFORMER 3 – GRATI | 1996 |
51. | HYUNDAI 5 TRAFO 95 T | 1996 – 1997 |
52. | SOFRESID/ PERTAMINA, TOTAL TUNU 2.500 FT, NORTH FIELD DEVELOPMENT | 1997 |
53. | GEC ASLTOM BARGING TO SUAL POWER STATION 5 BARGES 9000 T STEEL STRUCTURE | 1997 |
54. | COGELEX KEMBANGAN SS REPLACEMENT OF TRANSFORMER 148 T | 1997 |
55. | GEC ALSTHOM – POWER STATION LAHENDONG NORTH SULAWESI HEAVY LIFT 41 – 45 – 60 T – 3000 FT | 1997 |
56. | IFAC/ SCREP – MERAK PROJECT, HEAVY LIFT 68T, 75T, 95T | APRIL 1997 |
57. | DUMEZ SINGKARAK PROJECT, PADANG SUMATRA BARAT REEXPORT OF TEMPORARY IMPORT EQUIPMENT FIRST SHIPMENT 4303 FT | JUNE 1997 |
58. | SCAC/ PT SCHNEIDER SS HAURGAULIS, ONE TRANSFORMER 55T | JUNE 1997 |
59. | UNINDO/ META EPSI 1 TRANSFORMER 65T TO SERANG SS | |
60. | COGELEX 80T SHIFTING OF ONE TRANSFORMER OF 207t BY ROLLING AND SLIDING | 0CT 1997 |
61. | TIMOR CAR 2 HEAVY LIFT 126T – 96T | 27/29 OCT 1997 |
62. | PLN OPLONG | DECEMBER 1997 |
63. | DUMEZ TANGGARI PROJECT BITUNG, NORTH SULAWESI 1000 FT | JULY 1997 |
64. | EDF/GEC ALSTOM LAIBIN CHINA 18.000 M3 OF PIPES – 2 SHIPMENT IN 1997 – 4 SHIPMENT IN 1998 | 1997 – 1998 |
65. | PLN LAHENDONG PP – 1 X 69T – 1 X 55T | JANUARY 1998 |
66. | PLN KEMBANGAN SS 2 X 160T | JANUARY 1998 |
67. | TEXMACO ENGINEERING 2 X 160T | JANUARY 1998 |
68. | REHABILITATION OF CURUG IRIGATION PUMPING STATION PROJECT | 1998 |
69. | SUMATRA POWER TRANSMISSION PROJECT, TRANSMISSION LINES AND SUBSTATION OMBILIN/ COGELEX | 1998 |
70. | COGELEX PROTOCOL 95/96 – PLN SOUTH SULAWESI 150 KV SS LOT 2 5 X 62 T + 1 X 56T TRANSFORMER | 1998 |
71. | INDONESIA FOR HUMEX BONNA – LAIBIN – CHINA 18.000 M3 OF PIPES – 2 SHIPMENT IN 1997 – 4 SHIPMENT IN 1998 | 1997 – 1998 |
72. | CITRA INDONESIA/ TOTAL TUNU PROJECT – PIPE TRANSPORTATION 7 BARGES BATAM – PENDINGIN WHARF | MARCH – MAI 1998 |
73. | CITRA INDONESIA/ TOTAL PECIKO EPSC4 PIPES TRANSPORTATION CILEGON – SENIPA – GALANDRON PENDINGIN – SALIKI 82.000T | MAY – OCT 1998 |
74. | JEUMONT SCHNEIDER KLATEN SS , 880T/ 2175 M3 HEAVY LIFT | 1998 |
75. | NAVY HOSPITAL, JAKARTA SCAC | 1999 |
76. | CALBERSON / JEUMONT SCHNEIDER SOUTH SULAWESIE PLN PROTOCOL 95/96 LOT I – 8 TRANSFORMERS | 1999 |
77. | IKPT/ CALTEX DURI – 2 X 60T TANK / 18M X 4.5 X 5.6M | APRIL – 2000 |
78. | KN SIGMA TRANS/ EXPORT OF 9 UNIT DRYERS TEXMACO SEMARANG – TG.PRIOK FOR EXPORT | MARCH 2000 |
79. | INDOSHOPA – HOSPITAL EQUIPMENT | 2000 |
80. | ALSTOM / PLN LAHENDONG GEOTHERMAL POWER STATION SECOND PHASE | 2000 |
81. | THAMES PAM JAYA (CURRENT PROJECT) IMPORT GENERAL CARGO / VALVES | 2000 |
82. | PAM LYONNAISE JAYA (CURRENT PROJECT) IMPORT GENERAL CARGO / VALVES | 2000 |
83. | LATECOERE HANDLING AND ERECTION OF AN HUMAIN CENTRIFUGES AT LAKESPRA JAKARTA | 2001 |
84. | SNEF / PU – PUMPING STATION FOR FLOOD CONTROL JAKARTA | 2001 |
85. | TRANSPORT FROM KERANG POWER PLANT 75KM FROM DURI WEST SUMATRA TO BUKAKA YARD BAJANEGARA CILEGON WET JAVA – 1 GAS TURBINE ALSTOM 86T AND 1 GENERATOR 98T | 2001 |
86. | DEBUTANIZER COLUMN 30M LENGTH TRANSPORTED FROM EX.WORK CIKADE TO BALIKPAPAN | 2001 |
87. | TRANSFORMER LOADED AT PAUWELS FACTORY BEKASI TRANSPORTED TO PLN SUBTANTION AT PONDOK UNGU | 2001 |
88. | MAXUS TURBINE AND STATOR LOADED ONTO SEA FOX 3 RIG USING OUR FLY OVER BRIDGE | 2001 |
89. | PRIVATE TV TRANSMISSION RELAY TOWER JOGLO. | 2001 |
90. | FARENTINA DISMANTLING CANNING MACHINERY AND EXPORTATION TO MALAYSIA | 2001 |
91. | TRANSPORT OF DEBUTANIZER COLUMN 30M LENGTH FROM EX WORK CIKANDE WEST JAVA TO PERTAMINA UP-V BALIKPAPAN EAST KALIMANTAN CHIYODA INTERNATIONAL PT CITRA MEGAH KARYA GEMILANG. | 2001 |
92. | TRANSPORT AND ERECTION OF PASSAGER BRIDGE FOR MANADO (3 SETS) AND AMBON AIRPORT (1 SET) CONTRACT BETWEEN PT ISTANA KARANG LAUT AND DIRECTORATE GENERAL FOR AIR COMMUNICATION. | 2001 |
93. | TRANSPORT OF TRANSFORMER FROM EX WORK PAUWELS FACTORY BEKASI TO PLN PONDOK UNGU – PT ARTHAMUAT MULTIMODAL INDONESIA. | 2001 |
94. | MAXUS WIDURI PROJECT RECEIVING HEAVY LIFT CARGO ON HYDRAULIC TRAILER ALONG SIDE VESSEL. THEN LOADING ONTO BARGE BY ROLL-ON AND JACKING DOWN UNTIL 30 CM OF BARGE DECK. | 2001 |
95. | 6000 F/T OF PIPES TRANSPORTATION FROM FACTORY BALARAJA – TG.PRIOK PORT LENGTH 40.3 M ? 0.91 WEIGHT 10.6 T, FOR PT SWARNA BAJA/PT JEROSA MANDIRI | 2002 |
96. | KUFPEC / IKL SERAM PROJECT – TRANSPORT & HANDLING 5 UNITS HEAVY LIFT EX.PT TRANSALINDO BATAM UPTO KUFPEC JOB SITE AT BULA, SERAM INLAND INCLUDING 30 M LENGTH OF COLUMN | 2002 |
97. | EUKORIAL KOREA – TEMPORARY IMPORTATION OF 29 TRANSFORMERS FOR REPAIRE AT UNINDO FACILITIES AND RE-EXPORT TO KOREA. | 2002 |
98. | KUFPEC – DAEWOO SERAM PROJECT TRANSPORT OF 1 X TEST SEPARATOR 1 X PRODUCTION SEPARATOR. | 2002 |
99. | BONNA SABLA / EDF 300 F/T OF CONCTETE PIPES EXPORT TO VIETNAM-PHU MYPOWER STATION. | 2002 |
100. | KEDIRI ALSTOM TRANSMISSION / PLN | SEPT 2002-JULY 2003 |
101. | DEPOK ALSTOM TRANSMISSION / PLN. | OCT 2002 |
102. | UJUNG PANDANG SPIE ENERTRANS / DEPT PERHUBUNGAN. | NOV 2002 – AUGUST 2004 |
103. | PT PETROLOG INDAH TRANSPORTATION AND ERECTION OF CSU INLET SURGE DRUM FROM GRIYAN, BANTEN TO SENIPAH TOTAL FINAELF-PERTAMINA | APRIL 2003 |
104. | ROLITRANS INTERNATIONAL – 1 DRYER HEAVY LIFT 100T JAKARTA – BANDUNG | JAN 2003 |
105. | ARTHAMUAT – WARTSILA – PLN TARAKAN POWER STATION 102T X 2 HEAVY LIFT GENERATOR. | AUGUST 2003 |
106. | ARTHAMUAT – SIEMENS – PLN PAMERON POWER STATION BALI, HEAVY LIFT 146T, 130T, ETC. | |
107. | THALES ,DIRECTORATE GENERAL OF AIR COMMUNICATION EXTENSION OF UJUNG PANDANG AIRPOT. | DESEMBER 2003 |
108. | ARTHAMUAT , PAMERON BALI , 6 x MODULES 170 T and 130 T | JUNE 2003 |
109. | PANALPINA/JGC RIO TUBA MINE PALAWAN ISLAND PHILIPPINES, EQUIPMENT FROM SURABAYA TO RIO TUBA 3000 FT. | DECEMBER 2003 |
110. | THIESS CONTRACTOR INDONEISA : EXCAVATOR RH 170 , 85T,130T | DECEMBER 2003 |
111. | ALSTOM/ UNINDO – PLN : S/S GANDUL , 1 TRAFO 75 T, S/S SERANG, 1 X TRAFO 75T, S/S PUCAM/CIKANDE, 75T. | DECEMBER 2003 |
112. | KUEHNE-NAGEL – KCI FACTORY, SLIDING ONE UNIT MACHINE OF 25 T OUT OF FACTORY AND LOADING ON FLAT RACK CONTAINER WITH ACCESSORIES FOR EXPORT TO CHINA. | DECEMBER 2003 |
113. | PUNJ LLOYD INDONESIA – TOTAL, TRANSPORT ,OFFLOADING AND ERECTION ON FOUNDATION TURBO GENERATOR FROM SINGAPORE TO SENIPAH , EAST KALIMANTAN. | FEBRUARY 2004 |
114. | UNINDO – SDV, TRANSPORT OF TRANSFORMER TO AQABA. | FEBRUARY 2004 |
115. | UNINDO – INCO, TRANSPORT OF TRANSFORMER FROM UNINDO FACTORY TO SOROAKO, SULAWESI. | MARCH 2004 |
116. | PUNJ LLOYD – TOTAL, TRANSPORT OF ONE FLOTATION UNIT FROM SENIPAH JETTY TO SITE. | MARCH 2004 |
117. | PANALPINA-PHILIPPINES JGC RIO TUBA HPP PROJECT, EXPORT FROM JAKARTA TO RIO TUBA PRIVATE JETTY. | APRIL 2004 |
118. | ARTHAMUAT – HICKHAM INDONESIA, TRANSPORT FROM HICKHAM FACTORY TO PAITON, 1 UNIT PUMP | APRIL 2004 |
119. | SCHENKER-PUNJ LLOYD –TOTAL, OFFLOADING AND TRANSPORT FROM SENIPAH JETTY TO SITE OF 9 HEAVY LIFT EX.PUSPETINDO, SURABAYA. | MAY 2004 |
120. | APECS INDONESIA, TRANSPORT OF COMPRESSOR 80T AND COOLER 40T FROM RAMBA JETTY CONOCO FIELD RAMBA JETTY TO BATAM STAR ENERGY WAREHOUSE. | JULY 2004 |
121. | SCHENKER-PUSPETINDO-PUNJ LLOYD-TOTAL, SHIPMENT NO.1 & 2, 2 UNITS SUCTION SCRUBBER, 2 X 80T, EX-GRESIK EAST JAVA TO SENIPAH EAST KALIMANTAN. | AUG 2004 |
122. | BCD PROJECT CHIYONDA JAMBI (SUMATRA), 145T-45M; 160T-40M; 78T-32M. TRANSFORMER TO KEMBANGAN S/S, WEST JAYA. | SEPTEMBER 2004 |
123. | PT GUNA NUSA, ERECTION OF HRSG ALSTOM-ASTORIA PROJECT TRANPORT NOVEMBER JETTY TO FABRICATION YARD 8 MODULES 30M X 3M X 6M (255T 2ACH). | NOVEMBER 2004 |
124. | PT GUNA NUSA, RECEPTION 0F 12 MODULES OF 265 T AT GUNA NUSA JETTY AND DELIVERY TO ASSEMBLING AREA. | DECEMBER 2004 |
125. | PT KN SIGMA, 2 UNITS BALL MILLS 35T EACH. | DECEMBER 2004 |
126. | PT ARTHAMUAT – SIEMENS, DELIVERY ONTO FOUNDATION AT PLN TANJUNG EAST SUMATRA OF 2 TRANSFORMERS OF 80 T. | FEBRUARY 2005 |
127. | AREVA, RECEPTION OF 3 TRANSFORMERS FOR PLN TASIKMALAYA S/S CILACAP PORT, REINFORCEMENT OF 9 BRIDGES BEFORE TRANSFORMERS. | FEBRUARY 2005 |
128. | TOTAL INDONESIA LOADING OFFLOADING AND SLIDING ONTO FOUNDATION OF ONE COMPRESSOR AT BSP SENIPAH, EAST KALIMANTAN. | MARCH 2005 |
129. | TOTAL BSP SENIPAH LOADING ON TO LOW BED TRAILER AT TOTAL WORKSHOP AND OFFLOADING ON TO FOUNDATION AT PRODUCTION UNIT OF ONE UNIT AERIAL COMPRESSOR OF 43T. | MARCH 2005 |
130. | AREVA PLN LOT 4 – 500/ 150 KW DEPOK III SUBSTATION ARRIVAL OF 4 TRANSFORMER (140 T) EX.JAPAN AT TG.PRIOK DELIVERY TO DEPOK SITE ON FOUNDATION. | AUGUST 2005 |
131. | PANALPINA – INCO, 2 X 140 TON TRANSFORMER FROM MALILI PORT TO SOROWAKO PLANT SOUTH SULAWESI. | OCTOBER 2005 |
132. | SARANA CITRA ADICARYA, TRANSPORTATION OF HEAVY LIFT ROTOR MACHINES 7 ACCESSORIES FROM MAKASSAR TO BOSOWA SITE | DECEMBER 2005 |
133. | KN SIGMA, TRANSPORTATION OF 2 UNITS PANEL BOX FROM PEGANGSAAN II UPTO TG.PRIOK | APRIL 2006 |
134. | KN SIGMA, LOADING ONTO FLATRACK AND TRANSPORTATION OF ARMOR VEHICLE & WATER CANON FROM KARGA WALON LOG TO TG.PRIOK | APRIL 2006 |
135. | KFH BERTLING – INCO , SEA AND LAND TRANSPORTATION OF 147T TRANSFORMER FROM SINGAPORE TO MALILI. | JUNE 2006 |
136. | KN SIGMA TRANS, TRANSPORTATION FROM PT BUKAKA CIELUNGSI TO TG.PRIOK PORT OF CAMP BUILDING. | MAY 2006 |
137. | PT GUNANUSA UTAMA FABRICATOR, TRANSPORTATION 2 UNITS TECHNICAL BUILDING 80T AND 4 UNITS BOAT LANDING 80T. | AUGUST 2006 |
138. | PT JARDINE TANGGUH TRANSPORT SERVICES, INLAND TRANSPORT OF 3 UNITS TRAFOS (2 X 50T & 1 X 25T) FROM UNINDO FACTORY TO TG.PRIOK. | DECEMBER 2006 |
139. | KN SIGMA, TRANSPORTATION OF LV CAMP BUILDING 15T & MV CAMP BUILDING 65T FROM BUKAKA FACTORY CILEUNGSI TO TG.PRIOK GUDANG 304. | JANUARY 2007 |
140. | SMART, TARJUN PROJECT,HANDLING & TRANSPORTATION 1 UNIT BOILER AND 9 UNIT CONTAINER 9X20’ FROM JAKARTA TO TARJUN SITE BANJARMASIN SOUTH KALIMANTAN. | FEBRUARY 2007 |
141. | PT SULZER HICKHAM INDONESIA (PT SHI) TRANSPORTATION OF 1 UNIT HOTWELL PUM, DIM.L 9M X W 3.5M X H 3.5M, GW 18T FROM PT SHI PURWAKARTA TO GEO DIPA DIENG, CENTRAL JAVA WITH 6 EXELS + 2 UNITS PRIME MOVERS. | FEBRUARY 2007 |
142. | PT GAC SAMUDERA FREIGHT SERVICES, TRANSPORTATION OF 1 UNIT TURBINE ROTOR, DIM. L 5600 X 2600 X 2530MM, GW 12650 KGS FROM BOM BARU PALEMBANG PORT TO GUNUNG MEGANG SITE, MUARA ENIM AND RETURN FROM GUNUNG MEGANG SITE TO BOOM BARU PORT PALEMBANG WITH 6 AXELS. | JUNE 2007 |
143. | PT GAC SAMUDERA FREIGHT SERVICES, TRANSPORTATION OF 1 UNIT TURBINE ROTOR, DIM. L 5600 X 2600 X 2530MM, GW 12650 KGS FROM BOM BARU PALEMBANG PORT TO GUNUNG MEGANG SITE, MUARA ENIM AND RETURN 2 UNITS FROM GUNUNG MEGANG SITE TO BOOM BARU PORT PALEMBANG WITH 6 AXELS & 8 AXELS. | AUGUST 2007 |
144. | PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF STORAGE TANK (5,127X4.53X7.50M=13.423KGS) FROM SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK PORT BY LOWBED. | AUGUST 2007 |
145. | .PT. CIPTA KRIDA BAHARI, TRANSPORTATION OF 2 UNITS GENSET ENGINE 16CM 32C (8.20X3.15X3.80M=82T/ UNIT) AND 2 ALTERNATOR (4.30X2.88X3.61M=35T/UNIT) BY COMETTO 12 AXEL AND PRIMEMOVER FROM FOT WAREHOUSE SUNTER TO PLTD SIANTAN SITE PONTIANAK , KALIMANTAN BY LCT. | SEPTEMBER 2007 |
146. | PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF 1 UNIT GAS BOOSTER 61T WITH SPARE PARTS AND 1 UNIT OF SUCTION SCRUBBER 27T WITH SPARE PRATS FROM PT.SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK PORT. | OCTOBER 2007 |
147. | PT WAKERIN ANUGERAH ABADI/ PT PORMATCON, UNLOADING 3 UNITS COMPRESSOR BY ROLLING AND LOADING BY JACKING SYSTEM ONTO BLOWBED AT VICO MUTIARA GALENGGRONG SAMARINDA, KALIMANTAN. | NOVEMBER 2007 |
148. | PT MITRA INTERTRANS FORWADING (MIF), TRANSPORTATION OF 2 UNITS SKIDS (798X329X476.63CM=36T) FROM PT SURTA BESINDO SAKTI CIKANDE TO TG.PRIOK PORT BY 2 LOWBED. | NOVEMBER 2007 |
149. | PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF 3 UNITS OF SHELTER MCL BUILDING 330/ EACH AND 1 UNIT SPEADER BAR BY EXTENDED LOWBED TRAILLER (13M) FROM MULTI PANEL CIKARANG TO TG.PRIOK. | NOVEMBER 2007 |
150. | PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORT OF 1 UNIT GAS SEPARATOR (1553.62X392X413CM=72T) FROM SBS CIKANDE TO TG.PRIOK BY MULTI AXEL TRAILER 9AXEL. | NOVEMBER 2007 |
151. | PT WINDU PROJECT CARGO, TRANSPORTATION OF 1 UNIT TRANSFORMER & ACCESSORIES FROM UNINDO KLENDER TO TG.PRIOK BY 1 LOWBED & 2 TRAILLERS. | DECEMBER 2007 |
152. | PT.MITRA INTERTRANS FORWARDING (MIF) FOR HEERA PROJECT TRANSPORTATION. OF 3 UNITS MV.BUILDING (1220X740X375 CM=42T EACH), 1 UNIT B 134A BUILDING (890X460X305 CM=22T),2UNITS SPREADER BAR (774X655X50 & 460X460X50CM=4.5T EACH) BY 4 TRAILERS & 1 LOWBED). | JANUARY 2008 |
153. | PT ROLITRANS INTERNATIONAL TRANSPORTATION OF 1 UNIT DUAL GAS TRUBINE (13500X3200X3900MM=57T) FROM TG.PRIOK TO PT NESTLE KEJAYAN INDONESIA PASURUAN BY MULTI AXLE, 8AXLES. | JANUARY 2008 |
154. | PT GAMA INTI SAMUDRA LOAD OUT OIL JACKET 1500T AT GRESIK MARINA YACHT BY MULTI AXLE, 20 AXLES. | FEBRUARY 2008 |
155. | PT GAMA INTI SAMUDRA LOAD OUT OIL JACKET 1500T AT GRESIK MARINA YACHT BY MULTI AXLE 20 AXLES, TRANSPORTATION OF WIND TOWERS (20T EACH) BY 6 AXELS FROM PT KORINDO TO CIWANDAN. | MARCH 2008 |
156. | PT.MITRA INTERTRANS FORWARDING (MIF) FOR TRANSPORTATION 1 UNIT FUEL GAS 70T FROM PT SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK. | MARCH 2008 |
157. | PT PETROLOG INDAH – HALLIBURTON, PLACING 1 UNIT GENSET ONTO FOUNDATION BY JACKING SYSTEM AND SLIDING SYSTEM AT PENDINGIN, SANGA-SANGA, EAST KALIMANTAN. | MARCH 2008 |
158. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, INLAND TRANSPORTATION FROM GRESIK PORT AND PUSPETINDO FACTORY TO UJUNG PANGKAH UPD II SITE GRESIK 2 UNITS COMPRESSORS 70T, 3 UNITS COLUMN 80T BY MULTI AXLE, 12 AXLE. | MAY 2008-JULY 2008 |
159. | PT. MANE INDONESIA , LIFTING THE DRUMS ONTO BUILDING H23 BY CRAWLER CRANE CAP150T AT CIKARANG OFFICE. | MAY 2008 |
160. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 6 UNITS CARGOES, 2 UNITS OF STAGE FLASH GAS COOLER. | JUNE 2008 |
161. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 1 UNIT TANK (L9,50XW3,35XH3,55M) FROM PT SANGGAR SARANA BAJA/ SSB PULOGADUNG TO UPD II GRESIK BY LOWBED TRAILER. | MAY 2008 |
162. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF DE-ETHANIZER REFLUX ACCUMULATOR, COLD CLOSED DRAIN VESSEL AND COLD SEPARATOR FROM PUSPETINDO TO UPD II GRESIK BY 2 TRAILER OF 6M & 1 TRAILER OF 12M. | JUNE 2008 |
163. | PT.ARCA MANDIRI EKSPRESS, TRANSPORTATION OF 12 UNITS STORAGE TANK (18X3,8X4,1M) FROM GAJAH TUNGGAL FACTORY TANGERANG TO TG.PRIOK BY MULTI AXLE 10 & 12 AXLE. | JUNE 2008 |
164. | PT.TRIPATRA ENGINEERS AND CONSTRUCTORS, STRIPPING AND RE TRANSPORTATION OF 2 UNITS VRU COMPRESSOR PACKAGES FROM TG.PERAK PORT TO UPD II GRESIK BY 2 TRAILERS. | JUNE 2008 |
165. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 5 UNITS PLATFORM FROM PUSPETINDO TO UPD II GRESIK BY 5 LOWBED TRAILER (12M). | JUNE 2008 |
166. | PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 6 PACKAGES OF LPG COOLER FROM PUSPETINDO TO UPD II GRESIK BY 7 LOWBED & 4TRAILERS. | JULY 2008 |
167. | PT. LAWANG SEWU INT’ FORWARDING, LOADING AT BELAWAN PORT , UNLOADING BY JACKING AND RO-RO AT TEMPORARY JETTY DANAU SIOMBAK, TRANSPORTATION OF 5 UNITS HEAVY LIFTS TO PAYA PASIR SITE, UNLOADING, SLIDING AND JACKING ONTO FOUNDATION BY 2 PRIME MOVER AND MULTI AXLE 8 AXLE. | AGUT 2008 |
168. | PT TRIPATRA ENGINEERS AND CONSTRUCTORS TRANSPORTATION OF 6 PACKAGES OF LPG COOLER FROM PT PUSPETINDO TO UDP II GERSIK BY 7 LOWBED & 4 TRAILERS | |
169. | ARCA MANDIRI EKSPRESS, TRANSPORTATION & JACKING 4 UNITS INCINERATORS TANK 45T & 35T (18X3,8X4,5M) FROM SBB PULOGADUNG TO TG.PRIOK BY MULTI AXLE 10 AND 8 AXLES. | SEPT 2008 |
170. | PT. MITRA INTERTRANS FORWARDING, TRANSPORTATION OF 3 PACKAGES OF NOZLE (14,5MX3,6MX55CM) AT TG.PRIOK AREA BY 3 TRAILERS. | SEPT 2008 |
171. | PT.PANALPINA NUSAJAYA TRANSPORT, TRANSPORTATION OF HAND RAIL (404X110X157CM), LADDER, SUPPORT, PLATFORM (367X152X68CM) FROM PT ARKON BEKASI TO TG.PRIOK BY 7 LOWBED TRAILER. | SEPT 2008 |
172. | PT PTOMATCON TRANSPORTATION VESSEL 2500 FROM SANGGAR SARANA BAJA TO CILEGON BY 9 AXELS | OCT 2008 |
173. | PT KRAKATAU ENGINEERING, RECEIVING OF 2 UNITS STORAGE TANK 50 EACH FROM SHIPS SIDE AND TRANSPORTATION BY MULTI AXEL 14 AXEL FROM TG.PRIOK TO CILEGON | NOV 2008 |
174. | PT.BANDAR INDAH PERMATA JAKARTA,INLAND TRANSPORT OF 2 UNITS CABIN TRAIN BY MULTI AXEL 8 AXELS AND 9 AXELS FROM TG.PRIOK TO LAMPUNG | DEC 2008 |
175. | FH BERTLING PTE LTD SINGAPORE,TRANSPORTATION 1 UNIT E – 400 GENERATOR TRANSFORMER ( TURBINE GENERATOR ) COMPLETE WITH SURGE ARRESTER CURRENT TRANSFORMER AND ACCESSORIES. NW : 297.433 KGS / GW : 307.955 KGS / : 438.11 M3 FROM AREVA SINGAPORE TO REMBANG JETTY BY TB KIMTRANSS ROMEO BG KIMTRANS 2318 DISCHARGING TRANSFORMER FROM BARGE BY JACING SYSTEM | DEC 2008 |
176. | PT.PERDANA KARYA PERKASA, PLACEMENT ON FOUNDATION AND JACKING 2 UNITS COMPRESSOR 65T AT NILAM SATELITE, VICO MUTIARA SITE | JAN 2009 |
177. | PT.JATRINDO ANTARAN SENTRA JAKARTA, TRANSPORTATION OF 2 UNITS TRANSPORATION OF 2 UNITS TRANSFORMER 85T EACH FROM PAUWELS CILEUNGSI TO TG.PRIOK BY MULTI AXELS 9 AXELS | JAN 2009 |
178. | FUM LOGISTIC INLAND TRANSPORTATION OF PIPES (L:20M DIA. 1.5M, GW: 65T) FROM TG.PRIOK TO BAKRIE SOUTH ASIA BAKAHEUNI LAMPUNG BY MULTI AXELS 12 AXELS LAMPUNG BY MULTI AXELS 12 AXELS | FEB 2009 |
179. | PT.NURINDO LOGISTIC INLAND TRANSPORTATION OF 1 UNIT CARBAMATE 63T FROM TG.PRIOK TO PALEMBANG BY MULTI AXELS 8 AXELS | FEB 2009 |
180. | PT.JATRINDO ANTARAN SENTRA TRANSPORTATION OF 2 UNITS TRANSFORMER 85T EACH FROM PAUWELS CILEUNGSI TO TG.PRIOK BY MULTI AXELS 9 AXELS | FEB 2009 |
181. | .PETROLOG INDAH BALIKPAPAN INLAND TRANSPORTATION OF 1 UNIT VESSEL (V.2500) FROM PT SANGGAR SARANA BAJA PULOGADUNG TO SENIPAH JETTY BALIKPAPAN LOADED ON MULTI AXELS 12 AXELS BY TRIDAYA BARUNA 11/TK GOLDENSARI II LOADING AND OFFLOADING ONTO FROM BARGE BY JACKING SYSTEM AND TRANSPORTATION TO SITE ONTO FOUNDATION 3.5 M HIGH. | MARCH 2009 |
182. | PT ROLITRANS TRANSPORTATION OF 1 UNIT ROLLER PAIR 700X410X260X410CM FROM TG.PRIOK TO INDOCEMENT CITEUREUP BY MULTI AXLE 8 AXEL | MAY 2009 |
183. | PT CIPTA KRIDA BAHARI TRANSPORTATION OF 1 UNIT GENSET 3616-80T FROM DUMAI PORT TO PERTAMINA SITE DUMAI BY MULTI AXEL 8 AXEL | MAY 2009 |
184. | PT BANDAR INDAH PERMATA TRANSPORTATION OF 2UNITS PANEL CONTROL ROOM 50T & 60t FROM MULTI PANEL CIKARANG TO TG.PRIOK | MAY 2009 |
185. | PT ARCA MANDIRI TRANSPORTATION OF 1 UNIT SLIG CATCHER FROM PT SANGGAR SARANA BAJA (SSB) PULOGADUNG TO PANGKALAN BRANDAN BY MULTI AXEL 12 AXEL | JUNE 2009 |
186. | PT ARCA MANDIRI TRANSPORTATION OF 1 UNIT TANK FROM SANGGAR SARANA BAJA TO TG.PRIOK 2X10 AXEL | JUNE 2009 |
187. | PT LAWANG SEWU TRANSPORTATION OF 1 UNIT TRANSFORMER 100MVA 60T & ACCESSORIES FROM PT UNINDO KLENDER TO PLN CAWANG BY MULTI AXEL 9 AXEL | JULY 2009 |
188. | PT.TRANS NUSA ABADI ( TNA ) INLAND TRANSPORTATION OF 1 UNIT COMPRESSOR FROM TG.BATU TO TG.SANTAN KALIMANTAN TIMUR BY MULTI AXELS 9 AXELS & PRIMOVER | APRIL 2009 |
189. | PT META EPSI FOR JAVA BALI POWER SECTION RESTRUCTURING AND STRENGTHENING PROJECT PACKAGE IFB 2A&2B, SUPPLY & INSTALLATION OF 150 KV SUBSTATION FOR WEST JAVA AND JAKARTA IBRD LOAD NO.4712 IND SHIPMENT FROM FRANCE,INDIA AND SPAIN 4X40′,2X20′ HC ; 1X40′ OT & 1X20′ ELECTRICAL EQUIPMENT STRIPPING AT KARGA WALON YARD AND DELIVERY TO 21 SUBSTATION IN WEST JAVA | APRIL-AUG 2009 |
190. | PT LEMO UTAMA TRANSPORTATION 1 UNIT MACHINE 48,2T FROM TG.PRIOK KD 203 TO KIIC KRAWANG BY MULTI AXLE 9AXLE | AGUST 2009 |
191. | PT TRIGUNA INTERNUSA PRATAMA OFFLOADING 3 UNITS GAS COMPRESSOR AND FILTER SEPARATOR SKID FROM LOWBUOY/ TRAILER BY JACKING SYSTEM ONTO ANCHOR BOLT | OCTOBER 2009 |
192. | PT JATRINDO ANTARASENTRA TRANSPORTATION 1 UNIT TRANSFORMER 97T FROM PT PAUWELS TRAFO ASIA CILEUNGSI TO TG.PRIOK PORT BYMULTIAXLE 8 AXLE | OCTOBER 2009 |
193. | PT SAFE PROJECT LOGISTIC INDONESIA JACKING AND SLIDINGOF 2 UNIT TRANSFORMER, 5 UNITS ENGINE, AND 5UNITS ALTENATOR AT PT APAC INTI BAWEN, CENTRAL JAVE AND TRANSPORT TO PONTIANAK BY LCT ON PROCESS | SEPT 2009 |