List Of Executed Project

No.PROJECTYEAR
1. T.R.T PALAPA I & II GROUND STATION.
2. DUMEZ TP-PT HUTAMA KARYA, RENTANG IRRIGATION PROJECT. 1979
3. ALSTOM GAS TURBINES TO VARIOUS LOCATIONS (12 UNITS) IN JAVA AND SUMATRA 1976 – 1978
4. DUMEZ TP-PT MERCU BUANA RAYA CONTRACTOR,SAGULING DAM. 1980 – 1984
5. DUMEZ TP– WISMA BUMIPUTERA OFFICE BUILDING IN JAKARTA. 1980 – 1984
6. ASLTOM GAS TURBINES (10 UNITS) TO VARIOUS LOCATIONS/POWER STATIONS IN JAVA, SUMATRA, BALI AND SULAWESI. 1983 – 1984
7. RELOCATION OF ALSTHOM GAS TURBINES FROM PULOGADUNG TO CIREBON (2 UNITS). 1983
8. VARIOUS PROJECTS : FACTORIES, SOEKARNO-HATTA AIRPORT INDOCEMENT KILNS LINE 7 & 8 (162 TONS EA). 1983 – 1984
9. ALSTOM/ STEIN POWER STATION OF BUKIT ASAM. 1983 – 1988
10. SPIE/ C.R.M.I MILL HOUSING HOT MILL KRAKATAU STEEL. 1983 – 1988
11. HOLEC DIESEL ENGINES WITH HEAVIEST UNITS OF 160 TONS IN JAVA WEST KALIMANTAN, NORTH SUMATRA. THE MOLUCCAS AND NORTH SULAWESI , IN COOPERATION PT. UNGGUL TURANGGA. 1985 – 1986
12. HAWKER SIDDELEY SCATTERED DIESEL PROJECT, 23 ENGINES EACH WEIGHING 85 TONS, TO 7 LOCATIONS IN WEST TIMOR, EAST KALIMANTAN, NORTH AND SOUTH SUMATRA, IN COOPERATION WITH PT UNGGUL TURANGGA. 1985 – 1986
13. SPIE/ CITRA, CLUB MEDITERRANNEE HOTEL IN NUSA DUA, BALI. 1985 – 1988
14. COGELEX CIRATA PROJECT, 7 POWER TRANSFORMERS WEIGHING 65 T EACH 1987 – 1988
15. CGEE ALSTOM TRANSFORMERS, 11 UNITS EACH 40/52 TONS, FROM JAKARTA TO SEMARANG BY BARGE, THEN TO 11 POWER STATIONS IN CETRAL JAVA INCLUDING POSITIONING ON THE FOUNDATIONS. 1987 – 1988
16. MERLIN GERIN AUXILIARY SUPPLIES FOR SURALAYA POWER STATION. 1987
17. PELITA AIR SERVICE – FOKKER – 1 PACKED (DAMAGED) AIR CRAFT FOKKER 28 FROM DUMAI AIRPORT TO SEAPORT, AND BARGING TO SINGAPORE FOR ITS TRANSHIPMENT TO HOLLAND. 1987
18. DUMEZ DUMPIL DAM. 1988
19. TOSHIBA/ KAMIGUMI TRANSPORTATION UNLOADING AND SHIFTING 8 UNITS TURBINES (LP & HP) AND GENERATORS WEIGHING UPTO 200 T UPTO THE POWER HOUSE LOCATED AT P.L.N GRESIK. 1988
20. ALSTHOM – ASSISTING SCALEX IN MOVING AND SHIFTING 9 UNITS OF 380 T DIESEL ENGINES AT INDOCEMENT CIBINONG. 1988
21. ELLEEN – DISCHARGING 1 UNIT TRANSFORMER OF 130 T EX. VESSEL FROM HAMBURG ONTO LCT IN SURABAYA ON THE 22nd SEPTEMBER 1988, UNLOADING AT SEMARANG PORT IN SPECIALLY PREPARED BEACHHEAD (24/09/1988) AND LAND TRANSPORT TI UNGARAN POWER STATION IN CENTRAL JAVA AND PLACEMENT ON FOUNDATION. 1988
22. SOFRESID – PERTAMINA – TOTAL FOR TAMBORA TUNU PROJECT OF 1.500
23. ALCATEL CABLE POWER XV CABLE DRUMS SUPPLY (STARTED IN MARCH 1989). MARCH 1989
24. .G.E.E. ALSTOM COMSIP JABOTABEK ELECTRIFICATION LINE OF JABOTABEK.
25. COGELEX POWER XV THE PROJECT STARTED MIDDLE OF 1990. 1990
26. SOFRESID – PERTAMINA – TOTAL GAS LIFT PROJECT OF 2.500 T FINISHED IN 1991. 1991
27. DUMEZ TP – MAMAK DAM PROJECT, SUMBAWA BESAR THIS PROJECT FINISHED IN 1991. 1991
28. C.G.E.E ALSTOM COMSIP JABOTABEK ELECTRIFICATION LINE OF JABOTABEK 1991
29. COGELEX – JCC THIS PROJECT STARTED BY 1990 – 1991 1990 – 1991
30. DUMEZ – BUKIT ASAM THIS PROJECT STARTED IN JUNE 1991, TOTAL 2.000 FT JUNE 1991
31. COGELEX – PAITON PLTU PAITON, STARTED IN APRIL 1992, TOTAL 4.00O TONS APRIL 1992
32. ALCATEL CABLE TELECOM III, TOTAL 120.000 FT (STARTED IN 1992) 1992
33. C.M.I PROJECT 104 X 100 T HEAVY LIFT THE PROJECT STARTED IN 1992 AND TOTAL 80.000 FT 1992
34. CEGELEC – GRESIK CEGELEC GRESIK SUBSTATION , TOTAL 5.000 T 1992
35. ALCATEL A.T.F.H TRANS SUMATRA, TOTAL 1.000 T 1992
36. DUMEZ – SINGKARAK DAM PROJECT AND IN TOTALISES 15.000 FT MAY 1992
37. GEC ALSTOM STEIN BUKIT ASAM 2 X 65 MGW PHASES 3 AND 4 4X 100 T, HEAVY LIFT, TOTAL 34.000 FT SEPT 1992
38. RHONE POULENC – INDOLEX 1994 – 1995
39. SOFRESID HANDIL TUNU II 1995
40. COGELEX SURALAYA SS 1994 – 1995
41. COGELEX PROTOCOL ’91 1994 – 1995
42. GEC ALSTOM OMBILIN STEAM POWER PLANT 2 X 100 MGW, 4 X 100 T HEAVY LIFT 1994 – 1996
43. CMI GRATI STEAM BOILER (34 X 100t) HEAVY LIFT 1994 – 1995
44. ALCATEL CABLE NORTHERN ROAD 1995
45. ALCATEL CIT 1995
46. SNEF SHERATON BALI HOTEL 1995
47. PKB ALCATEL CABLE 1996 – 1997
48. U.K MIXED CREDIT 13 TRAFOS OF 68T 1996 – 1997
49. KOMARITIM/ ARCO 3 MODULES 72 T 1996
50. COGELEX – CILEGON SS 148 T X 4 UNIT TRANSFORMER 3 – GRATI 1996
51. HYUNDAI 5 TRAFO 95 T 1996 – 1997
52. SOFRESID/ PERTAMINA, TOTAL TUNU 2.500 FT, NORTH FIELD DEVELOPMENT 1997
53. GEC ASLTOM BARGING TO SUAL POWER STATION 5 BARGES 9000 T STEEL STRUCTURE 1997
54. COGELEX KEMBANGAN SS REPLACEMENT OF TRANSFORMER 148 T 1997
55. GEC ALSTHOM – POWER STATION LAHENDONG NORTH SULAWESI HEAVY LIFT 41 – 45 – 60 T – 3000 FT 1997
56. IFAC/ SCREP – MERAK PROJECT, HEAVY LIFT 68T, 75T, 95T APRIL 1997
57. DUMEZ SINGKARAK PROJECT, PADANG SUMATRA BARAT REEXPORT OF TEMPORARY IMPORT EQUIPMENT FIRST SHIPMENT 4303 FT JUNE 1997
58. SCAC/ PT SCHNEIDER SS HAURGAULIS, ONE TRANSFORMER 55T JUNE 1997
59. UNINDO/ META EPSI 1 TRANSFORMER 65T TO SERANG SS
60. COGELEX 80T SHIFTING OF ONE TRANSFORMER OF 207t BY ROLLING AND SLIDING 0CT 1997
61. TIMOR CAR 2 HEAVY LIFT 126T – 96T 27/29 OCT 1997
62. PLN OPLONG DECEMBER 1997
63. DUMEZ TANGGARI PROJECT BITUNG, NORTH SULAWESI 1000 FT JULY 1997
64. EDF/GEC ALSTOM LAIBIN CHINA 18.000 M3 OF PIPES – 2 SHIPMENT IN 1997 – 4 SHIPMENT IN 1998 1997 – 1998
65. PLN LAHENDONG PP – 1 X 69T – 1 X 55T JANUARY 1998
66. PLN KEMBANGAN SS 2 X 160T JANUARY 1998
67. TEXMACO ENGINEERING 2 X 160T JANUARY 1998
68. REHABILITATION OF CURUG IRIGATION PUMPING STATION PROJECT 1998
69. SUMATRA POWER TRANSMISSION PROJECT, TRANSMISSION LINES AND SUBSTATION OMBILIN/ COGELEX 1998
70. COGELEX PROTOCOL 95/96 – PLN SOUTH SULAWESI 150 KV SS LOT 2 5 X 62 T + 1 X 56T TRANSFORMER 1998
71. INDONESIA FOR HUMEX BONNA – LAIBIN – CHINA 18.000 M3 OF PIPES – 2 SHIPMENT IN 1997 – 4 SHIPMENT IN 1998 1997 – 1998
72. CITRA INDONESIA/ TOTAL TUNU PROJECT – PIPE TRANSPORTATION 7 BARGES BATAM – PENDINGIN WHARF MARCH – MAI 1998
73. CITRA INDONESIA/ TOTAL PECIKO EPSC4 PIPES TRANSPORTATION CILEGON – SENIPA – GALANDRON PENDINGIN – SALIKI 82.000T MAY – OCT 1998
74. JEUMONT SCHNEIDER KLATEN SS , 880T/ 2175 M3 HEAVY LIFT 1998
75. NAVY HOSPITAL, JAKARTA SCAC 1999
76. CALBERSON / JEUMONT SCHNEIDER SOUTH SULAWESIE PLN PROTOCOL 95/96 LOT I – 8 TRANSFORMERS 1999
77. IKPT/ CALTEX DURI – 2 X 60T TANK / 18M X 4.5 X 5.6M APRIL – 2000
78. KN SIGMA TRANS/ EXPORT OF 9 UNIT DRYERS TEXMACO SEMARANG – TG.PRIOK FOR EXPORT MARCH 2000
79. INDOSHOPA – HOSPITAL EQUIPMENT 2000
80. ALSTOM / PLN LAHENDONG GEOTHERMAL POWER STATION SECOND PHASE 2000
81. THAMES PAM JAYA (CURRENT PROJECT) IMPORT GENERAL CARGO / VALVES 2000
82. PAM LYONNAISE JAYA (CURRENT PROJECT) IMPORT GENERAL CARGO / VALVES 2000
83. LATECOERE HANDLING AND ERECTION OF AN HUMAIN CENTRIFUGES AT LAKESPRA JAKARTA 2001
84. SNEF / PU – PUMPING STATION FOR FLOOD CONTROL JAKARTA 2001
85. TRANSPORT FROM KERANG POWER PLANT 75KM FROM DURI WEST SUMATRA TO BUKAKA YARD BAJANEGARA CILEGON WET JAVA – 1 GAS TURBINE ALSTOM 86T AND 1 GENERATOR 98T 2001
86. DEBUTANIZER COLUMN 30M LENGTH TRANSPORTED FROM EX.WORK CIKADE TO BALIKPAPAN 2001
87. TRANSFORMER LOADED AT PAUWELS FACTORY BEKASI TRANSPORTED TO PLN SUBTANTION AT PONDOK UNGU 2001
88. MAXUS TURBINE AND STATOR LOADED ONTO SEA FOX 3 RIG USING OUR FLY OVER BRIDGE 2001
89. PRIVATE TV TRANSMISSION RELAY TOWER JOGLO. 2001
90. FARENTINA DISMANTLING CANNING MACHINERY AND EXPORTATION TO MALAYSIA 2001
91. TRANSPORT OF DEBUTANIZER COLUMN 30M LENGTH FROM EX WORK CIKANDE WEST JAVA TO PERTAMINA UP-V BALIKPAPAN EAST KALIMANTAN CHIYODA INTERNATIONAL PT CITRA MEGAH KARYA GEMILANG. 2001
92. TRANSPORT AND ERECTION OF PASSAGER BRIDGE FOR MANADO (3 SETS) AND AMBON AIRPORT (1 SET) CONTRACT BETWEEN PT ISTANA KARANG LAUT AND DIRECTORATE GENERAL FOR AIR COMMUNICATION. 2001
93. TRANSPORT OF TRANSFORMER FROM EX WORK PAUWELS FACTORY BEKASI TO PLN PONDOK UNGU – PT ARTHAMUAT MULTIMODAL INDONESIA. 2001
94. MAXUS WIDURI PROJECT RECEIVING HEAVY LIFT CARGO ON HYDRAULIC TRAILER ALONG SIDE VESSEL. THEN LOADING ONTO BARGE BY ROLL-ON AND JACKING DOWN UNTIL 30 CM OF BARGE DECK. 2001
95. 6000 F/T OF PIPES TRANSPORTATION FROM FACTORY BALARAJA – TG.PRIOK PORT LENGTH 40.3 M ? 0.91 WEIGHT 10.6 T, FOR PT SWARNA BAJA/PT JEROSA MANDIRI 2002
96. KUFPEC / IKL SERAM PROJECT – TRANSPORT & HANDLING 5 UNITS HEAVY LIFT EX.PT TRANSALINDO BATAM UPTO KUFPEC JOB SITE AT BULA, SERAM INLAND INCLUDING 30 M LENGTH OF COLUMN 2002
97. EUKORIAL KOREA – TEMPORARY IMPORTATION OF 29 TRANSFORMERS FOR REPAIRE AT UNINDO FACILITIES AND RE-EXPORT TO KOREA. 2002
98. KUFPEC – DAEWOO SERAM PROJECT TRANSPORT OF 1 X TEST SEPARATOR 1 X PRODUCTION SEPARATOR. 2002
99. BONNA SABLA / EDF 300 F/T OF CONCTETE PIPES EXPORT TO VIETNAM-PHU MYPOWER STATION. 2002
100. KEDIRI ALSTOM TRANSMISSION / PLN SEPT 2002-JULY 2003
101. DEPOK ALSTOM TRANSMISSION / PLN. OCT 2002
102. UJUNG PANDANG SPIE ENERTRANS / DEPT PERHUBUNGAN. NOV 2002 – AUGUST 2004
103. PT PETROLOG INDAH TRANSPORTATION AND ERECTION OF CSU INLET SURGE DRUM FROM GRIYAN, BANTEN TO SENIPAH TOTAL FINAELF-PERTAMINA APRIL 2003
104. ROLITRANS INTERNATIONAL – 1 DRYER HEAVY LIFT 100T JAKARTA – BANDUNG JAN 2003
105. ARTHAMUAT – WARTSILA – PLN TARAKAN POWER STATION 102T X 2 HEAVY LIFT GENERATOR. AUGUST 2003
106. ARTHAMUAT – SIEMENS – PLN PAMERON POWER STATION BALI, HEAVY LIFT 146T, 130T, ETC.
107. THALES ,DIRECTORATE GENERAL OF AIR COMMUNICATION EXTENSION OF UJUNG PANDANG AIRPOT. DESEMBER 2003
108. ARTHAMUAT , PAMERON BALI , 6 x MODULES 170 T and 130 T JUNE 2003
109. PANALPINA/JGC RIO TUBA MINE PALAWAN ISLAND PHILIPPINES, EQUIPMENT FROM SURABAYA TO RIO TUBA 3000 FT. DECEMBER 2003
110. THIESS CONTRACTOR INDONEISA : EXCAVATOR RH 170 , 85T,130T DECEMBER 2003
111. ALSTOM/ UNINDO – PLN : S/S GANDUL , 1 TRAFO 75 T, S/S SERANG, 1 X TRAFO 75T, S/S PUCAM/CIKANDE, 75T. DECEMBER 2003
112. KUEHNE-NAGEL – KCI FACTORY, SLIDING ONE UNIT MACHINE OF 25 T OUT OF FACTORY AND LOADING ON FLAT RACK CONTAINER WITH ACCESSORIES FOR EXPORT TO CHINA. DECEMBER 2003
113. PUNJ LLOYD INDONESIA – TOTAL, TRANSPORT ,OFFLOADING AND ERECTION ON FOUNDATION TURBO GENERATOR FROM SINGAPORE TO SENIPAH , EAST KALIMANTAN. FEBRUARY 2004
114. UNINDO – SDV, TRANSPORT OF TRANSFORMER TO AQABA. FEBRUARY 2004
115. UNINDO – INCO, TRANSPORT OF TRANSFORMER FROM UNINDO FACTORY TO SOROAKO, SULAWESI. MARCH 2004
116. PUNJ LLOYD – TOTAL, TRANSPORT OF ONE FLOTATION UNIT FROM SENIPAH JETTY TO SITE. MARCH 2004
117. PANALPINA-PHILIPPINES JGC RIO TUBA HPP PROJECT, EXPORT FROM JAKARTA TO RIO TUBA PRIVATE JETTY. APRIL 2004
118. ARTHAMUAT – HICKHAM INDONESIA, TRANSPORT FROM HICKHAM FACTORY TO PAITON, 1 UNIT PUMP APRIL 2004
119. SCHENKER-PUNJ LLOYD –TOTAL, OFFLOADING AND TRANSPORT FROM SENIPAH JETTY TO SITE OF 9 HEAVY LIFT EX.PUSPETINDO, SURABAYA. MAY 2004
120. APECS INDONESIA, TRANSPORT OF COMPRESSOR 80T AND COOLER 40T FROM RAMBA JETTY CONOCO FIELD RAMBA JETTY TO BATAM STAR ENERGY WAREHOUSE. JULY 2004
121. SCHENKER-PUSPETINDO-PUNJ LLOYD-TOTAL, SHIPMENT NO.1 & 2, 2 UNITS SUCTION SCRUBBER, 2 X 80T, EX-GRESIK EAST JAVA TO SENIPAH EAST KALIMANTAN. AUG 2004
122. BCD PROJECT CHIYONDA JAMBI (SUMATRA), 145T-45M; 160T-40M; 78T-32M. TRANSFORMER TO KEMBANGAN S/S, WEST JAYA. SEPTEMBER 2004
123. PT GUNA NUSA, ERECTION OF HRSG ALSTOM-ASTORIA PROJECT TRANPORT NOVEMBER JETTY TO FABRICATION YARD 8 MODULES 30M X 3M X 6M (255T 2ACH). NOVEMBER 2004
124. PT GUNA NUSA, RECEPTION 0F 12 MODULES OF 265 T AT GUNA NUSA JETTY AND DELIVERY TO ASSEMBLING AREA. DECEMBER 2004
125. PT KN SIGMA, 2 UNITS BALL MILLS 35T EACH. DECEMBER 2004
126. PT ARTHAMUAT – SIEMENS, DELIVERY ONTO FOUNDATION AT PLN TANJUNG EAST SUMATRA OF 2 TRANSFORMERS OF 80 T. FEBRUARY 2005
127. AREVA, RECEPTION OF 3 TRANSFORMERS FOR PLN TASIKMALAYA S/S CILACAP PORT, REINFORCEMENT OF 9 BRIDGES BEFORE TRANSFORMERS. FEBRUARY 2005
128. TOTAL INDONESIA LOADING OFFLOADING AND SLIDING ONTO FOUNDATION OF ONE COMPRESSOR AT BSP SENIPAH, EAST KALIMANTAN. MARCH 2005
129. TOTAL BSP SENIPAH LOADING ON TO LOW BED TRAILER AT TOTAL WORKSHOP AND OFFLOADING ON TO FOUNDATION AT PRODUCTION UNIT OF ONE UNIT AERIAL COMPRESSOR OF 43T. MARCH 2005
130. AREVA PLN LOT 4 – 500/ 150 KW DEPOK III SUBSTATION ARRIVAL OF 4 TRANSFORMER (140 T) EX.JAPAN AT TG.PRIOK DELIVERY TO DEPOK SITE ON FOUNDATION. AUGUST 2005
131. PANALPINA – INCO, 2 X 140 TON TRANSFORMER FROM MALILI PORT TO SOROWAKO PLANT SOUTH SULAWESI. OCTOBER 2005
132. SARANA CITRA ADICARYA, TRANSPORTATION OF HEAVY LIFT ROTOR MACHINES 7 ACCESSORIES FROM MAKASSAR TO BOSOWA SITE DECEMBER 2005
133. KN SIGMA, TRANSPORTATION OF 2 UNITS PANEL BOX FROM PEGANGSAAN II UPTO TG.PRIOK APRIL 2006
134. KN SIGMA, LOADING ONTO FLATRACK AND TRANSPORTATION OF ARMOR VEHICLE & WATER CANON FROM KARGA WALON LOG TO TG.PRIOK APRIL 2006
135. KFH BERTLING – INCO , SEA AND LAND TRANSPORTATION OF 147T TRANSFORMER FROM SINGAPORE TO MALILI. JUNE 2006
136. KN SIGMA TRANS, TRANSPORTATION FROM PT BUKAKA CIELUNGSI TO TG.PRIOK PORT OF CAMP BUILDING. MAY 2006
137. PT GUNANUSA UTAMA FABRICATOR, TRANSPORTATION 2 UNITS TECHNICAL BUILDING 80T AND 4 UNITS BOAT LANDING 80T. AUGUST 2006
138. PT JARDINE TANGGUH TRANSPORT SERVICES, INLAND TRANSPORT OF 3 UNITS TRAFOS (2 X 50T & 1 X 25T) FROM UNINDO FACTORY TO TG.PRIOK. DECEMBER 2006
139. KN SIGMA, TRANSPORTATION OF LV CAMP BUILDING 15T & MV CAMP BUILDING 65T FROM BUKAKA FACTORY CILEUNGSI TO TG.PRIOK GUDANG 304. JANUARY 2007
140. SMART, TARJUN PROJECT,HANDLING & TRANSPORTATION 1 UNIT BOILER AND 9 UNIT CONTAINER 9X20’ FROM JAKARTA TO TARJUN SITE BANJARMASIN SOUTH KALIMANTAN. FEBRUARY 2007
141. PT SULZER HICKHAM INDONESIA (PT SHI) TRANSPORTATION OF 1 UNIT HOTWELL PUM, DIM.L 9M X W 3.5M X H 3.5M, GW 18T FROM PT SHI PURWAKARTA TO GEO DIPA DIENG, CENTRAL JAVA WITH 6 EXELS + 2 UNITS PRIME MOVERS. FEBRUARY 2007
142. PT GAC SAMUDERA FREIGHT SERVICES, TRANSPORTATION OF 1 UNIT TURBINE ROTOR, DIM. L 5600 X 2600 X 2530MM, GW 12650 KGS FROM BOM BARU PALEMBANG PORT TO GUNUNG MEGANG SITE, MUARA ENIM AND RETURN FROM GUNUNG MEGANG SITE TO BOOM BARU PORT PALEMBANG WITH 6 AXELS. JUNE 2007
143. PT GAC SAMUDERA FREIGHT SERVICES, TRANSPORTATION OF 1 UNIT TURBINE ROTOR, DIM. L 5600 X 2600 X 2530MM, GW 12650 KGS FROM BOM BARU PALEMBANG PORT TO GUNUNG MEGANG SITE, MUARA ENIM AND RETURN 2 UNITS FROM GUNUNG MEGANG SITE TO BOOM BARU PORT PALEMBANG WITH 6 AXELS & 8 AXELS. AUGUST 2007
144. PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF STORAGE TANK (5,127X4.53X7.50M=13.423KGS) FROM SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK PORT BY LOWBED. AUGUST 2007
145. .PT. CIPTA KRIDA BAHARI, TRANSPORTATION OF 2 UNITS GENSET ENGINE 16CM 32C (8.20X3.15X3.80M=82T/ UNIT) AND 2 ALTERNATOR (4.30X2.88X3.61M=35T/UNIT) BY COMETTO 12 AXEL AND PRIMEMOVER FROM FOT WAREHOUSE SUNTER TO PLTD SIANTAN SITE PONTIANAK , KALIMANTAN BY LCT. SEPTEMBER 2007
146. PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF 1 UNIT GAS BOOSTER 61T WITH SPARE PARTS AND 1 UNIT OF SUCTION SCRUBBER 27T WITH SPARE PRATS FROM PT.SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK PORT. OCTOBER 2007
147. PT WAKERIN ANUGERAH ABADI/ PT PORMATCON, UNLOADING 3 UNITS COMPRESSOR BY ROLLING AND LOADING BY JACKING SYSTEM ONTO BLOWBED AT VICO MUTIARA GALENGGRONG SAMARINDA, KALIMANTAN. NOVEMBER 2007
148. PT MITRA INTERTRANS FORWADING (MIF), TRANSPORTATION OF 2 UNITS SKIDS (798X329X476.63CM=36T) FROM PT SURTA BESINDO SAKTI CIKANDE TO TG.PRIOK PORT BY 2 LOWBED. NOVEMBER 2007
149. PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORTATION OF 3 UNITS OF SHELTER MCL BUILDING 330/ EACH AND 1 UNIT SPEADER BAR BY EXTENDED LOWBED TRAILLER (13M) FROM MULTI PANEL CIKARANG TO TG.PRIOK. NOVEMBER 2007
150. PT MITRA INTERTRANS FORWARDING (MIF), TRANSPORT OF 1 UNIT GAS SEPARATOR (1553.62X392X413CM=72T) FROM SBS CIKANDE TO TG.PRIOK BY MULTI AXEL TRAILER 9AXEL. NOVEMBER 2007
151. PT WINDU PROJECT CARGO, TRANSPORTATION OF 1 UNIT TRANSFORMER & ACCESSORIES FROM UNINDO KLENDER TO TG.PRIOK BY 1 LOWBED & 2 TRAILLERS. DECEMBER 2007
152. PT.MITRA INTERTRANS FORWARDING (MIF) FOR HEERA PROJECT TRANSPORTATION. OF 3 UNITS MV.BUILDING (1220X740X375 CM=42T EACH), 1 UNIT B 134A BUILDING (890X460X305 CM=22T),2UNITS SPREADER BAR (774X655X50 & 460X460X50CM=4.5T EACH) BY 4 TRAILERS & 1 LOWBED). JANUARY 2008
153. PT ROLITRANS INTERNATIONAL TRANSPORTATION OF 1 UNIT DUAL GAS TRUBINE (13500X3200X3900MM=57T) FROM TG.PRIOK TO PT NESTLE KEJAYAN INDONESIA PASURUAN BY MULTI AXLE, 8AXLES. JANUARY 2008
154. PT GAMA INTI SAMUDRA LOAD OUT OIL JACKET 1500T AT GRESIK MARINA YACHT BY MULTI AXLE, 20 AXLES. FEBRUARY 2008
155. PT GAMA INTI SAMUDRA LOAD OUT OIL JACKET 1500T AT GRESIK MARINA YACHT BY MULTI AXLE 20 AXLES, TRANSPORTATION OF WIND TOWERS (20T EACH) BY 6 AXELS FROM PT KORINDO TO CIWANDAN. MARCH 2008
156. PT.MITRA INTERTRANS FORWARDING (MIF) FOR TRANSPORTATION 1 UNIT FUEL GAS 70T FROM PT SANGGAR SARANA BAJA PULOGADUNG TO TG.PRIOK. MARCH 2008
157. PT PETROLOG INDAH – HALLIBURTON, PLACING 1 UNIT GENSET ONTO FOUNDATION BY JACKING SYSTEM AND SLIDING SYSTEM AT PENDINGIN, SANGA-SANGA, EAST KALIMANTAN. MARCH 2008
158. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, INLAND TRANSPORTATION FROM GRESIK PORT AND PUSPETINDO FACTORY TO UJUNG PANGKAH UPD II SITE GRESIK 2 UNITS COMPRESSORS 70T, 3 UNITS COLUMN 80T BY MULTI AXLE, 12 AXLE. MAY 2008-JULY 2008
159. PT. MANE INDONESIA , LIFTING THE DRUMS ONTO BUILDING H23 BY CRAWLER CRANE CAP150T AT CIKARANG OFFICE. MAY 2008
160. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 6 UNITS CARGOES, 2 UNITS OF STAGE FLASH GAS COOLER. JUNE 2008
161. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 1 UNIT TANK (L9,50XW3,35XH3,55M) FROM PT SANGGAR SARANA BAJA/ SSB PULOGADUNG TO UPD II GRESIK BY LOWBED TRAILER. MAY 2008
162. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF DE-ETHANIZER REFLUX ACCUMULATOR, COLD CLOSED DRAIN VESSEL AND COLD SEPARATOR FROM PUSPETINDO TO UPD II GRESIK BY 2 TRAILER OF 6M & 1 TRAILER OF 12M. JUNE 2008
163. PT.ARCA MANDIRI EKSPRESS, TRANSPORTATION OF 12 UNITS STORAGE TANK (18X3,8X4,1M) FROM GAJAH TUNGGAL FACTORY TANGERANG TO TG.PRIOK BY MULTI AXLE 10 & 12 AXLE. JUNE 2008
164. PT.TRIPATRA ENGINEERS AND CONSTRUCTORS, STRIPPING AND RE TRANSPORTATION OF 2 UNITS VRU COMPRESSOR PACKAGES FROM TG.PERAK PORT TO UPD II GRESIK BY 2 TRAILERS. JUNE 2008
165. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 5 UNITS PLATFORM FROM PUSPETINDO TO UPD II GRESIK BY 5 LOWBED TRAILER (12M). JUNE 2008
166. PT. TRIPATRA ENGINEERS AND CONSTRUCTORS, TRANSPORTATION OF 6 PACKAGES OF LPG COOLER FROM PUSPETINDO TO UPD II GRESIK BY 7 LOWBED & 4TRAILERS. JULY 2008
167. PT. LAWANG SEWU INT’ FORWARDING, LOADING AT BELAWAN PORT , UNLOADING BY JACKING AND RO-RO AT TEMPORARY JETTY DANAU SIOMBAK, TRANSPORTATION OF 5 UNITS HEAVY LIFTS TO PAYA PASIR SITE, UNLOADING, SLIDING AND JACKING ONTO FOUNDATION BY 2 PRIME MOVER AND MULTI AXLE 8 AXLE. AGUT 2008
168. PT TRIPATRA ENGINEERS AND CONSTRUCTORS TRANSPORTATION OF 6 PACKAGES OF LPG COOLER FROM PT PUSPETINDO TO UDP II GERSIK BY 7 LOWBED & 4 TRAILERS
169. ARCA MANDIRI EKSPRESS, TRANSPORTATION & JACKING 4 UNITS INCINERATORS TANK 45T & 35T (18X3,8X4,5M) FROM SBB PULOGADUNG TO TG.PRIOK BY MULTI AXLE 10 AND 8 AXLES. SEPT 2008
170. PT. MITRA INTERTRANS FORWARDING, TRANSPORTATION OF 3 PACKAGES OF NOZLE (14,5MX3,6MX55CM) AT TG.PRIOK AREA BY 3 TRAILERS. SEPT 2008
171. PT.PANALPINA NUSAJAYA TRANSPORT, TRANSPORTATION OF HAND RAIL (404X110X157CM), LADDER, SUPPORT, PLATFORM (367X152X68CM) FROM PT ARKON BEKASI TO TG.PRIOK BY 7 LOWBED TRAILER. SEPT 2008
172. PT PTOMATCON TRANSPORTATION VESSEL 2500 FROM SANGGAR SARANA BAJA TO CILEGON BY 9 AXELS OCT 2008
173. PT KRAKATAU ENGINEERING, RECEIVING OF 2 UNITS STORAGE TANK 50 EACH FROM SHIPS SIDE AND TRANSPORTATION BY MULTI AXEL 14 AXEL FROM TG.PRIOK TO CILEGON NOV 2008
174. PT.BANDAR INDAH PERMATA JAKARTA,INLAND TRANSPORT OF 2 UNITS CABIN TRAIN BY MULTI AXEL 8 AXELS AND 9 AXELS FROM TG.PRIOK TO LAMPUNG DEC 2008
175. FH BERTLING PTE LTD SINGAPORE,TRANSPORTATION 1 UNIT E – 400 GENERATOR TRANSFORMER ( TURBINE GENERATOR ) COMPLETE WITH SURGE ARRESTER CURRENT TRANSFORMER AND ACCESSORIES. NW : 297.433 KGS / GW : 307.955 KGS / : 438.11 M3 FROM AREVA SINGAPORE TO REMBANG JETTY BY TB KIMTRANSS ROMEO BG KIMTRANS 2318 DISCHARGING TRANSFORMER FROM BARGE BY JACING SYSTEM DEC 2008
176. PT.PERDANA KARYA PERKASA, PLACEMENT ON FOUNDATION AND JACKING 2 UNITS COMPRESSOR 65T AT NILAM SATELITE, VICO MUTIARA SITE JAN 2009
177. PT.JATRINDO ANTARAN SENTRA JAKARTA, TRANSPORTATION OF 2 UNITS TRANSPORATION OF 2 UNITS TRANSFORMER 85T EACH FROM PAUWELS CILEUNGSI TO TG.PRIOK BY MULTI AXELS 9 AXELS JAN 2009
178. FUM LOGISTIC INLAND TRANSPORTATION OF PIPES (L:20M DIA. 1.5M, GW: 65T) FROM TG.PRIOK TO BAKRIE SOUTH ASIA BAKAHEUNI LAMPUNG BY MULTI AXELS 12 AXELS LAMPUNG BY MULTI AXELS 12 AXELS FEB 2009
179. PT.NURINDO LOGISTIC INLAND TRANSPORTATION OF 1 UNIT CARBAMATE 63T FROM TG.PRIOK TO PALEMBANG BY MULTI AXELS 8 AXELS FEB 2009
180. PT.JATRINDO ANTARAN SENTRA TRANSPORTATION OF 2 UNITS TRANSFORMER 85T EACH FROM PAUWELS CILEUNGSI TO TG.PRIOK BY MULTI AXELS 9 AXELS FEB 2009
181. .PETROLOG INDAH BALIKPAPAN INLAND TRANSPORTATION OF 1 UNIT VESSEL (V.2500) FROM PT SANGGAR SARANA BAJA PULOGADUNG TO SENIPAH JETTY BALIKPAPAN LOADED ON MULTI AXELS 12 AXELS BY TRIDAYA BARUNA 11/TK GOLDENSARI II LOADING AND OFFLOADING ONTO FROM BARGE BY JACKING SYSTEM AND TRANSPORTATION TO SITE ONTO FOUNDATION 3.5 M HIGH. MARCH 2009
182. PT ROLITRANS TRANSPORTATION OF 1 UNIT ROLLER PAIR 700X410X260X410CM FROM TG.PRIOK TO INDOCEMENT CITEUREUP BY MULTI AXLE 8 AXEL MAY 2009
183. PT CIPTA KRIDA BAHARI TRANSPORTATION OF 1 UNIT GENSET 3616-80T FROM DUMAI PORT TO PERTAMINA SITE DUMAI BY MULTI AXEL 8 AXEL MAY 2009
184. PT BANDAR INDAH PERMATA TRANSPORTATION OF 2UNITS PANEL CONTROL ROOM 50T & 60t FROM MULTI PANEL CIKARANG TO TG.PRIOK MAY 2009
185. PT ARCA MANDIRI TRANSPORTATION OF 1 UNIT SLIG CATCHER FROM PT SANGGAR SARANA BAJA (SSB) PULOGADUNG TO PANGKALAN BRANDAN BY MULTI AXEL 12 AXEL JUNE 2009
186. PT ARCA MANDIRI TRANSPORTATION OF 1 UNIT TANK FROM SANGGAR SARANA BAJA TO TG.PRIOK 2X10 AXEL JUNE 2009
187. PT LAWANG SEWU TRANSPORTATION OF 1 UNIT TRANSFORMER 100MVA 60T & ACCESSORIES FROM PT UNINDO KLENDER TO PLN CAWANG BY MULTI AXEL 9 AXEL JULY 2009
188. PT.TRANS NUSA ABADI ( TNA ) INLAND TRANSPORTATION OF 1 UNIT COMPRESSOR FROM TG.BATU TO TG.SANTAN KALIMANTAN TIMUR BY MULTI AXELS 9 AXELS & PRIMOVER APRIL 2009
189. PT META EPSI FOR JAVA BALI POWER SECTION RESTRUCTURING AND STRENGTHENING PROJECT PACKAGE IFB 2A&2B, SUPPLY & INSTALLATION OF 150 KV SUBSTATION FOR WEST JAVA AND JAKARTA IBRD LOAD NO.4712 IND SHIPMENT FROM FRANCE,INDIA AND SPAIN 4X40′,2X20′ HC ; 1X40′ OT & 1X20′ ELECTRICAL EQUIPMENT STRIPPING AT KARGA WALON YARD AND DELIVERY TO 21 SUBSTATION IN WEST JAVA APRIL-AUG 2009
190. PT LEMO UTAMA TRANSPORTATION 1 UNIT MACHINE 48,2T FROM TG.PRIOK KD 203 TO KIIC KRAWANG BY MULTI AXLE 9AXLE AGUST 2009
191. PT TRIGUNA INTERNUSA PRATAMA OFFLOADING 3 UNITS GAS COMPRESSOR AND FILTER SEPARATOR SKID FROM LOWBUOY/ TRAILER BY JACKING SYSTEM ONTO ANCHOR BOLT OCTOBER 2009
192. PT JATRINDO ANTARASENTRA TRANSPORTATION 1 UNIT TRANSFORMER 97T FROM PT PAUWELS TRAFO ASIA CILEUNGSI TO TG.PRIOK PORT BYMULTIAXLE 8 AXLE OCTOBER 2009
193. PT SAFE PROJECT LOGISTIC INDONESIA JACKING AND SLIDINGOF 2 UNIT TRANSFORMER, 5 UNITS ENGINE, AND 5UNITS ALTENATOR AT PT APAC INTI BAWEN, CENTRAL JAVE AND TRANSPORT TO PONTIANAK BY LCT ON PROCESS SEPT 2009